Completion

The “Nord-Süd” urban railway in Cologne not only improves Cologne’s inner-city flow of traffic but also features new architecture. In order to give every stop an unmistakable appearance, the planning of the station structures was awarded to different architects. The Severinstraße Station opened in December 2015 was implemented by kister scheithauer gross architekten.

News

The Federal State of Berlin commissioned HOCHTIEF LLBB GmbH with the construction and operation of a new laboratory building including administration areas for the Berlin-Brandenburg State Laboratory (LLBB). The design for the new building with a gross floor area of just over 22,800 square metres was originated by kister scheithauer gross.

Competitions

The CG Gruppe AG together with the City of Cologne selected the winners of the architectural competition for two out of eleven construction sites of the COLOGNEO I project in Cologne-Mülheim. In the end, the design by kister scheithauer gross came third. 

News

The state-owned company Sächsisches Immobilien- und Baumanagement (SIB), Branch Leipzig I, plans the construction of a Justice Centre in Leipzig. kister scheithauer gross architekten und stadtplaner (ksg) were awarded the contract for the building planning.

News

Our office is closed from the 18th december 2015 till the 4th january 2016. We wish you a merry christmas and a happy new year!

News

The current issue of “ksg inside” is dedicated to the transformation process of the Gerling Quartier. From the competition to the master planning with all its requirements and coordination efforts between monument preservation office, the city and fellow architects. Now published by ksg!

Completion

The new building of the Fraunhofer Center for High Temperature Materials and Design HTL, which belongs to the Institute for Silicate Research ISC in Würzburg, is used for the development of high-temperature materials for energy, propulsion and heat technology as well as aerospace technology. The two-storey building complex with an exceptional ceramic façade was implemented by kister scheithauer gross.

Competitions

The University of Freiburg implements a new building for the Institute of Anatomy and Cell Biology. After winning the VOF procedure with an angular typology and tectonic architectural vocabulary, ksg have started planning the first construction stage.

Competitions

The jury of the architectural design competition referred to the design by ksg as “architecturally strong building“. The planned commercial building for the Pasinger Marienplatz in Munich with the “distinct, innovative façade design” was awarded third place.

News

“Oscars of the property world” – the winners of this year’s FIABCI Prix d´Excellence Germany have been determined: Gold in the Housing category goes to COLÓN im PARK LINNÉ in Cologne.

Competitions

ksg was awarded 3rd place in the competition for the new community centre of the Catholic Congregation of St. Matthäus in Düsseldorf-Garath.

News

The Fraunhofer Institute für Physical Measurement Techniques IPM will get a new main building at the campus of the Technical Faculty in Freiburg. The planning for the currently largest Fraunhofer building project in Baden-Württemberg already started in 2012.

Completion

The building complex on Soldmannstraße in Greifswald, which was so far used as a children’s hospital, is a coherent ensemble, which was classified as a monument. Geschäftsbereich Hochschul- und Klinikbau des Betriebs für Bau und Liegenschaften Mecklenburg-Vorpommern (BBL M-V) is responsible for the entire building project and converts the buildings for a future utilisation by the Institute for Botany and Landscape Ecology as well as the Institute for Zoology at Ernst Moritz Arndt University.

Competitions

“Cautiously extending the existing complex” was the task set by the City of Cologne for the extension building of the Hildegard-von-Bingen Gymnasium in the negotiated procedure, which was won by ksg. Part of the services was an impromptu design. Completion is scheduled for 2020.

Competitions

After a successful VOF procedure, ksg were awarded the commission for the construction of the new Building 272. In the scope of the overall refurbishment of the Chemical Institutes, preparations for the demolition and new construction shall be commenced in spring 2016.

News

After ksg already implemented the first construction phase of the Max Planck Institute for Social Anthropology in 2001, the architects were commissioned with the construction of the 4-storey extension building in 2013. The festive ceremony of laying the foundation stone of the institute building took place on 19 May 2015.

News

Structural works for one of the largest housing projects in the Lehel District have been completed. On 23 April, the topping-out ceremony was celebrated on Oettingenstraße. Until 2016, 105 new condominiums will be completed here. The façade design was developed by ksg.

News

ksg was awarded the commission in the VOF procedure. The planning phase for the LZM Lehrzentrum Maschinenbau of Darmstadt University of Technology is now in full swing. The monolithic building will be constructed with a fair-faced concrete façade.

Completion

How a 1980s practice can be converted into modern premises is illustrated by the interior design department of ksg with the concept for the Cardiology Practice in Düsseldorf, which was implemented during ongoing operations.

Competitions

The Wintergartenareal office building is situated in a prominent location in the Leipzig city centre and in close vicinity to the main station. Furthermore, it is only a few metres from a high-rise tower block dating from the early 1970s. The adjoining development consists of listed residential and commercial buildings from the Gründerzeit period.